Skip to product information
Nylon Dog Training Leash – 15 ft (4.5m) Long Lead for Walking & Recall Training
$18.95
Give Your Dog the Freedom to Explore — Safely
Whether you're working on recall training at the park or letting your pup roam a little further on your morning walk, this 15-foot nylon leash gives you the control you need without keeping your dog on a short leash. Lightweight, strong, and available in five bold colors, it's a versatile everyday essential for dog owners.
Why Dog Owners Love It
- Extra-long 15 ft (4.5m) length ideal for recall training, beach walks, and open spaces
- Durable nylon construction resists fraying and holds up to pulling and tugging
- Lightweight design won't weigh your dog down during training sessions
- 1.2 cm width provides a comfortable grip for handlers
- 5 vibrant colors so you can spot your leash easily in your gear bag
Specifications
- Material: Nylon
- Length: 4.5 m (approx. 15 ft)
- Width: 1.2 cm (approx. 0.5 in)
- Available colors: Blue, Green, Grey, Orange, Red
- Extendable: No
Package Contents
1× Dog Leash