Blue and black rope leash with carabiner on a white background

Nylon Dog Training Leash

Blue / 15ft
$18.95
Skip to product information
Blue and black rope leash with carabiner on a white background

Nylon Dog Training Leash

$18.95

Give Your Dog the Freedom to Explore — Safely

Whether you're working on recall training at the park or letting your pup roam a little further on your morning walk, this 15-foot nylon leash gives you the control you need without keeping your dog on a short leash. Lightweight, strong, and available in five bold colors, it's a versatile everyday essential for dog owners.

Why Dog Owners Love It

  • Extra-long 15 ft length ideal for recall training, beach walks, and open spaces
  • Durable nylon construction resists fraying and holds up to pulling and tugging
  • Lightweight design won't weigh your dog down during training sessions
  • 0.5 in wide provides a comfortable grip for handlers
  • 5 vibrant colors so you can spot your leash easily in your gear bag

Specifications

  • Material: Nylon
  • Length: 15 ft (4.5 m)
  • Width: 0.5 in (1.2 cm)
  • Available colors: Blue, Green, Grey, Orange, Red
  • Extendable: No

Package Contents

1× Dog Leash

Color
Size15ft

Why Shop With Timberwolf Boutique


🚚 Free Shipping Included 🔒 Secure Checkout 🇺🇸 Family‑Owned Business 🔁 Easy Returns

You may also like